Excavating & Grading
Site prep, over-excavation, drainage swales, and RV or shop pad building — the dirt work the slab depends on.
Concrete Driveways & Approaches
A driveway is the biggest single slab most homes will ever have poured, and on Colorado's Front Range it has to survive expansive clay, a 40-degree temperature swing in a single afternoon, and dozens of freeze-thaw cycles a winter. Eagle Eye digs the site, builds the base, and finishes the pour with one crew — residential driveways, approaches, aprons, and RV pads across Douglas, Elbert, and Arapahoe counties.
Every driveway we pour is priced as a written, line-item estimate after an on-site walkthrough, so you can see exactly what is and isn't in the number. A typical scope covers:
Almost every prematurely failed driveway we replace comes down to one of three shortcuts: the base was never compacted, the joints were cut late or spaced too far apart, or the mix and cure weren't right for the climate. The soil here doesn't forgive any of them. Bentonite clay swells when it gets wet and shrinks when it dries, and a slab sitting on unprepared clay will heave, settle, and spall within a few winters. We spend the time on the part you can't see — the dirt and the base — because that's what determines how long the part you can see lasts.
A light broom finish is the workhorse: it gives traction on a slope in the snow and hides surface wear. If you want the driveway to do more, we also pour stamped and decorative concrete — ashlar slate, seamless texture, and banding with integral or release color — and exposed-aggregate finishes that hold up well to plows and shovels.
Most residential driveways are two to four days on site. After the pour, stay off the concrete on foot for about a day, keep it clear of vehicles for seven days, and hold off on parking anything heavy or applying any de-icer until it has cured for roughly 28 days. We schedule around weather — we won't place a slab into a hard freeze or an afternoon thunderstorm just to keep a date.
Related Work
The driveway is usually part of a bigger scope. We handle the rest of it too.
Site prep, over-excavation, drainage swales, and RV or shop pad building — the dirt work the slab depends on.
Parking lots, drive aisles, sidewalks, and curb and gutter for HOAs, retail, and municipal work.
Hold back a sloped yard, build up a low spot, or add poured steps and landings that match the driveway.
Recent driveways, patios, flatwork, and structures from across the Front Range.
Questions
Most residential driveways are a two to four day job on site: demo and excavation, base and forming, the pour, and finishing. Plan to stay off it for about seven days and keep vehicles off for a full cure of roughly 28 days, though that varies with temperature.
Four inches over a compacted base is standard for cars and light trucks. We pour five to six inches, thicken the edges, and add reinforcement where RVs, trailers, or delivery trucks will drive.
We don’t recommend it. An overlay traps the problems underneath and rarely lasts. We remove the old slab, correct the base and drainage, and pour new.
All concrete develops hairline shrinkage cracks. Our control-joint layout is designed to steer them into the joints where they are not visible. Structural cracking from a workmanship issue is covered by the written warranty on every job.
When a driveway or a new curb cut needs a permit or a right-of-way review from the city or county, we pull it and schedule the required inspections as part of the job.
Free, no-pressure estimates on concrete driveways across the Colorado Front Range.